HARMONY RESORTS - POOL - 2022-06-13
Pass
Facility Information
- Site Address
, ,
- Community
- Facility Type
Inspection Detail
- Date
- 2022-06-13
- Inspection Type
- Required
Inspection Results
Result | Compliant | Corrected During Inspection |
---|---|---|
At least 14 days before a public pool or public spa is put into use after construction or alteration, the owner or the owner’s agent shall notify, in writing, the medical officer of health or the public health inspector.
|
||
Facility completes and records daily tests at least 30 minutes prior to opening and as required.
|
||
Facility completes daily records as required.
|
||
Facility completes weekly or monthly tests as required.
|
||
Facility maintains pH level as required.
|
||
Written emergency and operational procedures and instructions are available.
|
Actions Taken
- Inspection Report Provided
- Satisfactory - Corrected during inspection
- Verbal Consultation